High-speed railway line usage (Germany) [closed]
I am not sure where else to ask this question, so please close if off-topic (or point to a more suitable place).
I am interested to know what the theoretical highest frequency (i.e. shortest separation time/distance), supported by current train control technology, between consecutive trains is on European, especially German, high-speed railway lines. I would like to use the number to calculate the theoretical maximum throughput on certain routes for a comparison between different transportation modes.
Best Answer
The capacity of the oldest (and probably busiest) European high-speed line (LGV Sud-Est, Paris-Lyon, France) used to be about 12 trains/hour, i.e. a headway of 4 minutes. It's probably around 15 tph nowadays
The minimal headway is dependent on the technology used. France has used variants of the TVM system (TVM 300, TVM 430). Now most new lines are equipped with the new ERTMS/ETCS system. There are several different levels with different performances (in terms of max speed, mostly, AFAIK), though deployment of level 2 has been quite difficult and a lot slower than anticipated (see issues on HSL Zuid and others).
It looks like the minimum headway on ETCS Level 2 is about 2 minutes at 300 km/h. The minimum headway increases slightly as speed goes beyond 300 km/h.
Note that the minimal headway is not the only parameter, as you have many other limitations, including coexistence of trains running at different max speeds, supported signalling, station capacity, merging and splitting traffic (with acceleration and deceleration times), mix of non-stop and stopping traffic (ditto), buffers for delays, etc.
It's probably unreasonable to think that you can actually sustain much more than 15 or maybe 20 trains an hour. Note also that this is usually very concentrated on a few hours each day (with specific patterns around the week-end, holidays, etc.).
If you read french, an interesting and very detailed document on the topic (how to increase the capacity on that line to beyond 12 tph) is available here:
http://cgedd.documentation.developpement-durable.gouv.fr/documents/cgedd/2004-0085-01.pdf
Not extremely recent, but I don't think the overall concepts have changed much since then.
You'll understand that the given capacity constraints have led to the development and large scale deployment of the TGV Duplex trains, in order to maximise the number of passengers transported per train path. Two coupled units can carry well over 1000 passengers.
Pictures about "High-speed railway line usage (Germany) [closed]"
Does Germany have high-speed rail?
The ICE (InterCity Express) is a high-speed train that connects all major cities in Germany. With speeds up to 300km/h, this is one of the fastest ways to travel between cities such as Berlin, Hamburg and Cologne.Why are trains so slow in Germany?
But the root cause of Germany's sluggishness remains: the tracks are not built for high-speed. While modern ICE train-sets can go 300 km/h, many tracks allow just 200 km/h. The heavy-traffic section between K\xf6ln and Hannover is a particular bottleneck.How many high-speed trains are there in Germany?
It is the highest service category of rail and the flagship train of the German state railway, Deutsche Bahn. There are currently 259 trainsets in use.Story Behind German High Speed Rail System
Sources: Stack Exchange - This article follows the attribution requirements of Stack Exchange and is licensed under CC BY-SA 3.0.
Images: Elena Saharova, anna-m. w., Hinrich Oltmanns, Christian Santiago